# Run-of-river hydro generation — Spain

- Country: ES
- Timezone: Europe/Madrid
- Public window: 2026-08-15 to 2026-08-22
- Unit: MW

## Today (2026-08-22)

- Average: 570.00 MW
- Minimum: 540.00 MW
- Maximum: 604.00 MW
- Observations: 12

## Previous seven complete days (2026-08-15 to 2026-08-21)

- Average: 559.09 MW
- Minimum: 424.00 MW
- Maximum: 776.00 MW
- Observations: 525
