# Hard-coal generation — Spain

- Country: ES
- Timezone: Europe/Madrid
- Public window: 2026-08-14 to 2026-08-21
- Unit: MW

## Today (2026-08-21)

- Average: 0.00 MW
- Minimum: 0.00 MW
- Maximum: 0.00 MW
- Observations: 155

## Previous seven complete days (2026-08-14 to 2026-08-20)

- Average: 53.68 MW
- Minimum: 0.00 MW
- Maximum: 210.00 MW
- Observations: 2014
